CASE STUDIES

EXCEL DISTRIBUTION

Alba Case Study

MFL Ltd were contracted to design, supply and install new rasied Mezzanine Floor for Exel Logistics in Westfield

Theremit was to create a raised floor to allow a multi-level haning garment storage system to be installed above, with Garment soration underneath.

The floor was finished in Graphite Grey with contrasting Blue an Orange mesh handrails panels to the permimeter.

The floor compised of 3200 sq meters, incorporating gantry's, staircases, and special and knee rail mesh panels.

MORE CASE STUDIES

TURBINE MOTOR WORKS

MFL Ltd were contracted to design, supply and install 2 complete new mezzanine floors inside 2 old World War II aircraft hangers.
View Case Study

E.WALTERS

MFL Ltd were contracted to design,   supply and install a complete new multi level garment warehouse, storage and handling system.
View Case Study

PORT OF TYNE AUTHORITY

MFL Ltd were awarded the contract to supply and install a new raised mezzanine floor for the Port of Tyne Authority in South Shields.
View Case Study