CASE STUDIES

E. WALTERS

Alba Case Study

MFL were contracted to design,  supply and install a complete new multi level garment warehouse, storage and handling system.

The construction comprised of mezzanine floors with multi tier Catwalk racking on top.

Transportation of hanging garments by the use of a overhead speedrail trolley system

Incorporating inter tier trolley, conveyors, staircases and vehicle loading bays.

MORE CASE STUDIES

TURBINE MOTOR WORKS

MFL were contracted to design, supply and install 2 complete new mezzanine floors inside 2 old World War II aircraft hangers.
View Case Study

EXEL distribution

MFL were contracted to design, supply and install new rasied Mezzanine Floor for Exel Logistics in Westfield
View Case Study

PORT OF TYNE AUTHORITY

MFL were awarded the contract to supply and install a new raised mezzanine floor for the Port of Tyne Authority in South Shields.
View Case Study